LHT signs overhaul contract for SAS' landing gear
Lufthansa Technik AG and SAS Scandinavian Airlines System have signed a contract regarding services for more than 20 landing gear sets of the airline
Home » MRO & Production » Page 841
Lufthansa Technik AG and SAS Scandinavian Airlines System have signed a contract regarding services for more than 20 landing gear sets of the airline
Shannon Aerospace has signed a contract with British Airways for the supply of Line Maintenance services at Shannon International Airport. The contract is for Extended-range Twin-engine Operational Performance Standard (ETOPS) checks on eleven BA A318 aircraft services per week. The maintenance relates to the launch of a new transatlantic business class-only service by British Airways
On May 29th, Sikorsky Aerospace Services, the aftermarket business of Sikorsky Aircraft Corp., formally dedicated its Composite Technology Inc. (CTI) unit’s new world-class, “purpose built” helicopter blade repair and overhaul center at Dallas/Fort Worth International Airport in Texas. The new, state-of-the-art 152,000-square-foot building was designed using Lean manufacturing concepts, and is nearly three times the
Lufthansa Technik is to supply components for the three Airbus A310F aircraft belonging to Indian cargo airline Deccan Cargo and Express Logistics. The company has signed a ten-year Total Component Support TCS contract to this effect, under which it will repair and overhaul the A310F fleet
Lufthansa Technik AG has been awarded the status of
Panama Aerospace Engineering (PAE) has redelivered its first Embraer E-190 aircraft to Copa Airlines after maintenance. The aircraft was inducted at PAE for a C check. This induction follows a certification of a new E-190 capability at the facility in April 2009. In February this year, PAE also added a new A320 capability, and has
On April 1st, 2009, the Swedish CAA conducted a follow-up audit for the EASA Part 145 Line Maintenance expansion for the Bombardier CRJ aircraft. The audit was performed and approved without findings, and conducted as a follow-up audit on the December approval for the CRJ.
Global Aerospace Corporation announced its innovative solution for the Dash-8 and CRJ Hamilton Sundstrand air cycle machine housing repair. Providing a permanent result, this exclusive housing repair is comprised of a dish insert manufactured from stainless steel along with unique machining processes that allows for a custom fit within the cracked housing, providing superior performance
Boeing has achieved another significant milestone for the first 747-8 Freighter by completing assembly of the airplane’s forward fuselage. The 89-foot, 2-inch (27.2 m) fuselage section, featuring the airplane’s signature upper deck, was moved from the final assembly installation tool for sealing and testing before beginning systems installation.
Airbus Corporate Jet Centre based in Toulouse France, has ordered a CTT Caire System to be installed, during fall 2009, in one Airbus VIP A319 aircraft. Airbus Corporate Jet Centre is a major completion center for the Airbus Corporate Jet Family, offering top quality cabin outfitting and associated services, with the newest standard of technology.
Home » MRO & Production » Page 841