The GE Rolls-Royce Fighter Engine Team has successfully hit full afterburner on its third new production-configuration engine, continuing a year of major progress and milestones for the F136 program. The afterburner tests were conducted in an advanced testing facility at GE. All major objectives have been reached during this phase of testing, which included an engine nozzle common to both F-35 engine programs. The Joint Strike Fighter aircraft was designed from its inception to include interchangeability with the F136 engine.
Six F136 engines are scheduled for testing this year, to measure engine performance and endurance as the competitive engine for the F-35 program continues to demonstrate steady progress and significant milestones. F136 performance is meeting all expectations in terms of thrust, temperature margins, and fuel consumption –confirming the vital role that it will play competing in the Joint Strike Fighter program over several decades.