Goodrich Corporation’s electric brake system for the Boeing 787 Dreamliner has completed all required dedicated flight test conditions. The achievement follows a comprehensive development and qualification program involving multiple Goodrich business units and close collaboration with Boeing. The braking system incorporates the latest iteration of Goodrich’s proprietary DURACARB carbon heat sink material which provides exceptional brake performance and up to 35% better brake life than competing carbon friction materials. Required test conditions included extensive on-aircraft testing of the wheels and electric brake hardware as well as validation of the proprietary software incorporated in the electric brake actuator controllers. Maximum brake energy testing was completed at Edwards Air Force Base in California.
Main Menu
Goodrich completes Boeing 787 electric braking system certification
Share this Article
[avi_get_posts]


