Boeing has started final assembly of the 787-9 Dreamliner at its South Carolina facility. The team began joining large fuselage sections of the newest 787 Nov. 22nd, on schedule, a proud milestone for the South Carolina team and another sign of stability for the program. The North Charleston, S.C., site joins Boeing’s Everett, Wash., final assembly, which began 787-9 production in May 2013. United Airlines will take delivery of the first South Carolina-built 787-9.
Main Menu
Boeing South Carolina begins final assembly of first 787-9 Dreamliner
Share this Article
[avi_get_posts]


