Sikorsky Aircraft Corporation has successfully completed the VH-92A Presidential Helicopter Replacement Program Preliminary Design Review (PDR), completion of the integration and performance testing of mission communications system (MCS) components, and Sikorsky’s acceptance of the second S-92A aircraft for the program. On May 7th, 2014, the Navy awarded a US$1,244,677,064 fixed-price incentive engineering and manufacturing development (EMD) contract with production options to Sikorsky for 21 operational and two test aircraft. Initial fielding is planned for 2020, with production concluding in 2023. Under the contract, Sikorsky will use its in-production S-92 aircraft and integrate government-defined mission systems and install an executive interior. The PDR, completed on Aug. 21, allowed the VH-92A team to demonstrate the preliminary design for the VH-92A aircraft, including integration of the MCS, and the supporting logistics elements. Completing this step signals that the program is ready to proceed into detailed design (Critical Design Review).
Main Menu
Sikorsky completes VH-92A Presidential Helicopter Replacement Program milestones
Share this Article
[avi_get_posts]


