Ground testing is underway on the first full GE9X development engine, which is the world’s largest commercial aircraft engine, at GE Aviation’s Peebles Testing Operation in Ohio. The GE9X engine will power Boeing’s new 777X aircraft. Maturation testing of the GE9X engine began about five years ago and has progressed from component-level all the way to the first full engine to test (FETT). FETT brings all the GE9X technologies together to demonstrate their operability as a complete propulsion system. Compared to other engine programs, the GE9X FETT happened earlier in the development process, just a mere six months after the engine design was finalized. This timing assures all learnings from FETT will be captured in the certification engines. Next year will be a busy year for the GE9X program with the start of certification testing and flight testing on GE Aviation’s flying test bed. Engine certification is anticipated in 2018. With almost 700 GE9X engines on order, the GE9X engine will be in the 100,000 pound thrust class and will have the largest front fan at 134 inches in diameter with a composite fan case and 16 fourth generation carbon fiber composite fan blades.
Main Menu
First full GE9X engine begins testing
Share this Article
[avi_get_posts]


