The one-stop shop at RUAG Aviation in Munich optimised the downtime required for a Bombardier Challenger CL604 heavy maintenance event. Responding to the request of the aircraft owner, the 192-month maintenance, repair and overhaul (MRO) inspection included a full cabin refurbishment for the older aircraft. The Challenger CL604 aircraft, registered in the Middle East, was delivered on time and to complete customer satisfaction.
Main Menu
RUAG completes cabin interior refurbishment during heavy maintenance check on Challenger CL604
Share this Article
[avi_get_posts]


