The 500th Eurofighter Typhoon has been delivered to the Italian Air Force during a special ceremony held at Leonardo Aircraft Division’s Turin site. The first Eurofighter was delivered to the UK Royal Air Force at the end of 2003. The 100th Eurofighter was delivered to the UK Royal Air Force in September 2006. The 200th aircraft was handed over to the German Air Force in November 2009. The 300th aircraft was delivered to the Spanish Air Force in October 2011, and the 400th to the German Air Force in December 2013. The aircraft has demonstrated, and continues to demonstrate, high reliability across the globe in all climates.
Main Menu
500th Eurofighter Typhoon produced, delivered to Italian Air Force
Share this Article
[avi_get_posts]