Liebherr-Aerospace Lindenberg GmbH and Flybe have entered into an agreement covering the overhaul of the main and nose landing gear systems of the airline’s Embraer E175 and E195 aircraft. The contract was signed recently at Flybe’s headquarters in Exeter (UK). The agreement covers the airline’s fleet of 20 Embraer E175 and E195.
Main Menu
Liebherr-Aerospace signs agreement on E-Jet 175 and 195 landing gear overhaul with Flybe
Share this Article
[avi_get_posts]


